Pm592 Week 2

In: Business and Management

Submitted By gutiehec
Words 828
Pages 4
Instructions: Please complete all 3 multi-part problems for this week's assignment.

2-1 Basic Estimating Problem
Your company is installing a new piece of machining equipment and a robotic arm. Your manager asks for the project costs by cost category as well as the total amount. Given the following information, develop a base cost estimate by grouping costs by Equipment / Material (items 1 – 4), Installation / Labor (items 5 and 6), and Overhead (items 7-9). 1. Two pieces of equipment costing $ 15,000 and $ 35,000 2. Material required for electrical hook-up is 400 feet at $ 25 per foot 3. Controls for each piece of equipment are estimated at $ 600 each 4. Required start-up material is 3,700 pounds at $ 2.70 per pound 5. Company labor for installation requires two maintenance specialists for two days at eight hours per day and $ 35 per hour 6. Contract labor is estimated at a fixed price of $ 7,500 7. Engineering is estimated to be 15% of (equipment / material) cost based on past experience 8. Inspection is estimated to be 3% of (labor) cost based on past experience 9. General and Administrative expenses are estimated to be 5% of the total of (equipment / material) and (labor) based on past experience.
Note: For this problem, only items 5 and 6 are considered "labor" for the purpose of calculating items 8 and 9.
Check answer: Total project cost = $94,737.60

2-2 Three-point Estimate Problem (a) A project requires the use of structural steel in several tasks over the 12 month period expected to complete the work. Based on recent experience the most likely price for the material is $0.30/lb. There are, however, price fluctuations over time based on suppliers used and structural steel availability. The most optimistic price estimate is $0.24/lb., and the most pessimistic estimate is $0.62/lb.
Use the three-point…...

Similar Documents

Pm592 Week 5 Assignment

...Pm592 Week 5 Assignment PM 592 Week 5 Assignment Problem 5-1 – Earned Value Calculation 1. What are the PV, EV and AC for the project at the end of end Day 6? PV = $101,000 AC = $88,880 EV = (PV x % Completed) = 101,000 x 6/7 = $86,860 2. What are the SV, CV, SPI and CPI for the project? SV = (EV-PV) = $86,860 - $88,880 = $-14,140 (Project is behind schedule) CV = (EV-AC) = $86,860 - $88,880 = $-2,020 (Project is over budget) SPI = (EV/PV) = .86 (If the number is below 1.0 which means the project is behind schedule) CPI = (EV/AC) = .97 (If the number is below 1.0, so the cost is greater than budget (over-budget) 3. Asses the project performance to date? Do you get to have the celebration. No celebration. The project at the end of day 6 is overbudget and behind schedule. Problem 5-2 – 1. Calculate the schedule variance for each task and the total project. - (EV-PV) Task A – (1600 – 1600) = 0 Task B – (4000 – 4000) = 0 Task C – (12,645 – 14050) = -1405 Task D – (580 – 1450) = -870 Task E – (0 – 2000) = -2000 Task F- = 0 Task G = 0 Total SV = -4275 2. Calculate the cost variance for each task and the total project. - (EV-AC) Task A – (1600 – 1800) = -200 Task B – (4000 – 4500) = -500 Task C – (12,645 – 13500) = -855 Task D – (580 – 500) = 80 Task E – (0 – 0) = 0 Task F- = 0 Task G = 0 Total C = -1475 3. What is your......

Words: 320 - Pages: 2

Pm592 Cp-2

...CP-2 Theme Park PM592 Project Cost and Schedule Control Oct 21, 2012 Introduction The construction of the new theme park project is laid out for 180 days of construction to finish. This project has a start Date of Monday April 4, 2008. The preliminary cost is $4,449,920.00 and with a completion date of December 19, 2008. The theme park will include a Ferris wheel, Rope course, Climbing walls, Carousel, Bowling, Go carts, and a Mini golf. The desired walk through date is December 18, 2008 with a grand opening on December 19, 2008. Executive Summary It has been 6 months since the start of the project and we now have 40% of the tasks complete. The actual cost so far to date is $1,230,683.00. There are many of the scheduled tasks behind in this schedule. The entire project thus far is behind schedule with a work performance index of .66 and 12% behind schedule. There are corrective actions that can get this project beck on schedule at minimal cost. This project should not be abandoned and should continue forward with the support of the investors. Schedule 1 This data is being supplied from MS Project. The WBS includes all work that has to be done to complete the project from start to finish. The current WBS includes all the data and baseline, review date and the current date is set to October, 1, 2008. The project start date is April, 14, 2008. Nearly 6 months into the project it is set at 40% complete. This shows the project is behind schedule. The...

Words: 3824 - Pages: 16

Pm592 Week 4 Assignment

... A 4 weeks -- 1 Cutting Platform/$800 day. | B 4 weeks -- 1 Sand Blast Machine/$1,000 day. | C 3 weeks B 1 Rolling Mill/$750 day. | D 2 weeks A,C 1 Automatic Welder/$1,000 day. | E 3 weeks B 1 Rolling Mill/$750 day. | F 5 weeks D,E 1 Sand Blast Machine/$1,000 day. | The fabricator has only one machine of each type available at the above costs, and operations cannot be split (i.e. once started, the task must finish). Additional equipment can be rented at a 75% cost premium if needed. Hint: A premium implies you pay an amount above and beyond the current amount. a. Identify any resource conflicts in the above project. State the activities involved, the time frame of the conflict(s), the resources in conflict and the quantity of resource involved. Hint: The key to this problem is the layout you choose for the project. To identify resource conflicts, the schedule will have to include a timescale. b. What is the least cost method of resolving the conflict(s), assuming the project duration must not be extended? What additional cost, if any, will be incurred? Hint: The Project Manager may have to be creative here to propose the optimal solution. Check answer: There is a 3 day conflict and there is extra cost involved in resolving. Answer: a. Conflict exists during weeks 5, 6, &......

Words: 812 - Pages: 4

Pm592 Week 5 Assignment

...5-1 through 5-2 (Graded) 5-1 Earned Value Calculation You are 4 months into a 6 month project. The project is linear, which means that the progress and spending occurs at a constant rate. Our crack project team of highly skilled associates has worked diligently and put in extra hours to keep the project going. Our accounting department has provided the following data at the end of month 4: Actual cost to date = $88,800 Planned expenditures to date = $101,000 The CFO is excited and has sent you an email congratulating you for being 12.07% under budget. However, is it really time to hold a team celebration? That would be fun but your project manager mentality kicks in. Those numbers look good but how are we ‘really’ doing? To understand the true project performance, we need to apply earned value techniques. The missing piece we need is Earned Value (i.e. what we have actually accomplished so far). You meet with your team and find that only 6 of the 7 tasks scheduled to be complete by the end of month 4 have actually been completed. Task 7 isn’t even started! This information gives you the final data you need to apply ‘Earned Value’ and develop an objective analysis. 1. What are the PV, EV, and AC for the project at the end of month 4? 2. What are the SV, CV, SPI, and CPI for the project? 3. Assess the project performance to date? Do you get to have the celebration? 1. PV - $101,000 AC -$88,800 EV = $101,000 X 6/7(.857) = $86,571 2. SV=......

Words: 679 - Pages: 3

Pm592 – Week 2 Assignment Problems

... 2-1 Basic Estimating Problem Your company is installing a new piece of machining equipment and a robotic arm. Your manager asks for the project costs by cost category as well as the total amount. Given the following information, develop a base cost estimate by grouping costs by Equipment / Material (items 1 – 4), Installation / Labor (items 5 and 6), and Overhead (items 7-9). 1. Two pieces of equipment costing $ 15,000 and $ 35,000 2. Material required for electrical hook-up is 400 feet at $ 25 per foot 3. Controls for each piece of equipment are estimated at $ 600 each 4. Required start-up material is 3,700 pounds at $ 2.70 per pound 5. Company labor for installation requires two maintenance specialists for two days at eight hours per day and $ 35 per hour 6. Contract labor is estimated at a fixed price of $ 7,500 7. Engineering is estimated to be 15% of (equipment / material) cost based on past experience 8. Inspection is estimated to be 3% of (labor) cost based on past experience 9. General and Administrative expenses are estimated to be 5% of the total of (equipment / material) and (labor) based on past experience. Note: For this problem, only items 5 and 6 are considered "labor" for the purpose of calculating items 8 and 9. Check answer: Total project cost = $94,737.60 Answer – Material/Equipment Amount ($) Totals Equipment #1 15000 =15,000 Equipment #2 35000 =35,000 Electrical hookup material 25 * 400 =10,000 Equipment control 600 * 2 =......

Words: 677 - Pages: 3

Pm592 Week 5 Assignment

...PM 592 Week 5 Assignment Problem 5-1 – Earned Value Calculation 1. What are the PV, EV and AC for the project at the end of end Day 6? PV = $101,000 AC = $88,880 EV = (PV x % Completed) = 101,000 x 6/7 = $86,860 2. What are the SV, CV, SPI and CPI for the project? SV = (EV-PV) = $86,860 - $88,880 = $-14,140 (Project is behind schedule) CV = (EV-AC) = $86,860 - $88,880 = $-2,020 (Project is over budget) SPI = (EV/PV) = .86 (If the number is below 1.0 which means the project is behind schedule) CPI = (EV/AC) = .97 (If the number is below 1.0, so the cost is greater than budget (over-budget) 3. Asses the project performance to date? Do you get to have the celebration. No celebration. The project at the end of day 6 is overbudget and behind schedule. Problem 5-2 – 1. Calculate the schedule variance for each task and the total project. - (EV-PV) Task A – (1600 – 1600) = 0 Task B – (4000 – 4000) = 0 Task C – (12,645 – 14050) = -1405 Task D – (580 – 1450) = -870 Task E – (0 – 2000) = -2000 Task F- = 0 Task G = 0 Total SV = -4275 2. Calculate the cost variance for each task and the total project. - (EV-AC) Task A – (1600 – 1800) = -200 Task B – (4000 – 4500) = -500 Task C – (12,645 – 13500) = -855 Task D – (580 – 500) = 80 Task E – (0 – 0) = 0 Task F- = 0 Task G = 0 Total C = -1475 3. What is your assessment of the project at this time? The project is behind schedule and overbudget at the......

Words: 316 - Pages: 2

Pm592 Week 2 Assignment Problems

...for this week's assignment. 2-1 Basic Estimating Problem Please look at the Attached Excel sheet for answer for first problem only. 2-2 Three-point Estimate Problem (a) Data: a = the best case estimate = $0.24/lb. m= the most likely estimate = $0.30/lb. b= the worst case estimate = $0.62/lb. Answer: We have to determine the E-value: E = (a + (4*m) + b) /6 E = (0.24 + (4 * 0.30) + 0.62)/ 6 E = $0.34/lb. (b) Data: a = the best case estimate = 37 tons m= the most likely estimate = 40 tons. b= the worst case estimate = 49 tons Answer: We have to determine the E-value: E = (a + (4*m) + b) /6 E = (37 + (4 * 40) + 47)/ 6 E = 40.66 tons or 41 tons if you want to round it up. (c) Using the estimates from 1 & 2, what is the expected cost for structural steel over the life of the project? ( 41 tons * 2000lbs.) = 82,000 lbs. Therefore, the estimates would be: $0.34/lb * 82,000 lbs = $27,880 (d) Using the "Complex" three-point method, what is the expected cost for structural steel over the life of the project? Expected cost: $0.34/lb * 82,000 lbs = $27,880 Most optimistic cost: $0.24/lb * 74,000 lbs = $17,760 Most pessimistic cost: $0.62/lb * 98,000 lbs = $60,760 The final estimated cost for the material is: (($17,760 + (4 * $27,880) + $60,760))/6 = $31,673.33 2-3 Contingency Allowance......

Words: 411 - Pages: 2

Pm592 Week 2 Assignment

...Instructors: Both questions and answers have been provided to assist you with the grading process. The correct answers can be found in blue text. 2-1 Basic Estimating Problem Your company is installing a new piece of machining equipment and a robotic arm. Your manager asks for the project costs by cost category as well as the total amount. Given the following information, develop a base cost estimate by grouping costs by Equipment / Material (items 1 – 4), Installation / Labor (items 5 and 6), and Overhead (items 7-9). 1. Two pieces of equipment costing $ 15,000 and $ 35,000 2. Material required for electrical hook-up is 400 feet at $ 25 per foot 3. Controls for each piece of equipment are estimated at $ 600 each 4. Required start-up material is 3,700 pounds at $ 2.70 per pound 5. Company labor for installation requires two maintenance specialists for two days at eight hours per day and $ 35 per hour 6. Contract labor is estimated at a fixed price of $ 7,500 7. Engineering is estimated to be 15% of (equipment / material) cost based on past experience 8. Inspection is estimated to be 3% of (labor) cost based on past experience 9. General and Administrative expenses are estimated to be 5% of the total of (equipment / material) and (labor) based on past experience. Note: For this problem, only items 5 and 6 are considered "labor" for the purpose of calculating items 8 and 9. Check answer: Total project cost = $94,737.60 Equipment and Material Two pieces......

Words: 771 - Pages: 4

Pm592 Week 2 Assignment Problems

...Week 2 Assignment Problems 2-1 Basic Estimating Problem: * Equipment / Material: 1. $15,000 + $35,000 = $50,000.00 2. 400ft x $25.00 per ft. = $10,000.00 3. $600 x (2) pcs of equipment= $1,200.00 4. 3,700 lbs @ $2.70 per pd= $9,990.00 Total Equipment/ Material = $71,190.00 * Installation/Labor: 5. $35.00 per hour x (8) hours = $280.00 per day per person $280.00 per person x (2) = $560.00 per person x (2) days = $1,120.00 6. Fixed Labor = $7,500.00 Total Installation/Labor = $8,620.00 * Overhead: 7. Engineering 15% of $71,190 = $10,678.50 8. Inspection 3% of $8,620 = $ 258.60 9. Equipment 5% of $71,190= $ 3,559.50 + $8,620 x 5% = $431.00 = $3,990.50 Total Overhead= $14,927.60 Total Project Cost = $94,737.60 * 2-2 Three Point Estimate Problem A) Price for the material is $0.30/ LB The most optimistic price estimate is $0.24/LB The most pessimistic estimate is $0.62/LB The expected price of the material: Pexp = (Popt + 4 x Pmost + Ppess)/6 Pexp = (0.24 + (4 x 0.30 + 0.62) / 6 Pexp = 0.24 + (1.2 + 0.62) / 6 Pexp = 0.24 + 1.82/ 6 Pexp= 2.06 /6 Pexp = 0.34/ LB B) One Ton = 2,000 lbs Popt = Optimistic Cost = 37 Tons Pmost = Most Likely Cost = 40 Tons Ppess = Pessimistic Cost = 49 Tons Pexp = (Popt + 4 x Pmost + Ppess) / 6 Pexp = (37 + 4 x 40 + 49) / 6 Pexp = 37 + 160 + 49/ 6 Pexp = 246/ 6 Pexp = 41/ Tons C) Expected Cost for......

Words: 464 - Pages: 2

Pm592 Week 6 Hw

...Problems 6-1: Forecasting project completion (Ungraded) A project has been estimated to take six weeks and cost $130,000. Cost and percent complete data are provided in the table below through 3 weeks of the project. % scheduled data can be obtained from the Gantt chart following the table. Task | $/Task | Week 1 | Week 2 | Week 3 | Week 4 | Week 5 | Week 6 | A | $5,000 | 100% | 100% | 100% | | | | B | $10,000 | 50% | 70% | 100% | | | | C | $25,000 | | 40% | 80% | | | | D | $30,000 | | 20% | 45% | | | | E | $10,000 | | | | | | | F | $20,000 | | | | | | | G | $20,000 | | | 50% | | | | H | $10,000 |   | 80% | 100% |   |   |   |   | ACWP | $12,000 | $38,000 | $66,000 |   |   |   | Task | BAC | % Comp | BCWP (EV) | BCWS (PV) | ACWP (AC) | cv | sv | cpi | svi | A | $5,000 | 100% | $5,000 | $5,000 | $5,500 | ($500) | $0 | 0.91 | 1.00 | B | $10,000 | 100% | $10,000 | $10,000 | $9,500 | $500 | $0 | 1.05 | 1.00 | C | $25,000 | 80% | $20,000 | $25,000 | $19,000 | $1,000 | ($5,000) | 1.05 | 0.80 | D | $30,000 | 45% | $13,500 | $20,000 | $12,500 | $1,000 | ($6,500) | 1.08 | 0.68 | E | $10,000 |   |   |   |   |   |   |   |   | F | $20,000 |   |   |   |   |   |   |   |   | G | $20,000 | 50% | $10,000 | $10,000 | $9,000 | $1,000 | $0 | 1.11 | 1.00 | H | $10,000 | 100% | $10,000 | $10,000 | $10,500 | ($500) | $0 | 0.95 | 1.00 |   | $130,000......

Words: 743 - Pages: 3

Pm592 Week 2 Assignment Problems

...Michael West, D00474854 2-1 Basic Estimating Problem Your company is installing a new piece of machining equipment and a robotic arm. Your manager asks for the project costs by cost category as well as the total amount. Given the following information, develop a base cost estimate by grouping costs by Equipment / Material (items 1 – 4), Installation / Labor (items 5 and 6), and Overhead (items 7-9). 1. Two pieces of equipment costing $ 15,000 and $ 35,000 2. Material required for electrical hook-up is 400 feet at $ 25 per foot 3. Controls for each piece of equipment are estimated at $ 600 each 4. Required start-up material is 3,700 pounds at $ 2.70 per pound 5. Company labor for installation requires two maintenance specialists for two days at eight hours per day and $ 35 per hour 6. Contract labor is estimated at a fixed price of $ 7,500 7. Engineering is estimated to be 15% of (equipment / material) cost based on past experience 8. Inspection is estimated to be 3% of (labor) cost based on past experience 9. General and Administrative expenses are estimated to be 5% of the total of (equipment / material) and (labor) based on past experience. Note: For this problem, only items 5 and 6 are considered "labor" for the purpose of calculating items 8 and 9. Check answer: Total project cost = $94,737.60 Equipment & Materials Cost Equipment $15,000 $35,000 Total $50,000 Materials for Electrical Hookup 400/ft * $25.00 per......

Words: 1173 - Pages: 5

Pm592 Week 2

...  Week two assignment 2-1 Basic Estimating Problem Equipment Costs $15,000.00 $35,000.00 $50,000.00 Electrical Hook-up 400 Feet $25.00/Ft $10,000.00 Equipment Controls 2 $600.00 $1,200.00 Start-up Materials 3700 Lbs $2.70/Lb $9,990.00 Total Equipment & Material $71,190.00 Personnel 2/day for 8 hours 32 Hours $35.00 Per Hour $1,120.00 Contract Labor Fixed Costs $7,500.00 $7,500.00 Total Installation & Labor $8,620.00 $8,620.00 Engineering Costs for Equip & Materials 15% $10,678.50 Inspections 3% $00,258.60 General & Admin 5% $03,990.50 2-2 Three-point Estimate Problem (a) Use the three-point estimating process to determine the expected price of the material. =(0.24+(4*0.30)+0.62)/6 = $0.34/lb. (b) Use the three-point estimating process to determine to determine the expected amount of structural steel needed for the project? =(37+(4*40)+49)/6 = 41 tons (c) Using the estimates from 1 & 2, what is the expected cost for structural steel over the life of the project? $ 0.34 * 82,000 = $27,880 (d) Using the "Complex" three-point method, what is the expected cost for structural steel over the life of the project? Expected cost: 0.34 * 82,000 = $27,880 Most optimistic cost: 0.24 * 74,000 = $17,760 Most pessimistic cost: 0...

Words: 436 - Pages: 2

Pm592 Wk 2 Assignment

...Instructions: Please complete all 3 multi-part problems for this week's assignment. 2-1 Basic Estimating Problem Your company is installing a new piece of machining equipment and a robotic arm. Your manager asks for the project costs by cost category as well as the total amount. Given the following information, develop a base cost estimate by grouping costs by Equipment / Material (items 1 – 4), Installation / Labor (items 5 and 6), and Overhead (items 7-9). 1. Two pieces of equipment costing $ 15,000 and $ 35,000 2. Material required for electrical hook-up is 400 feet at $ 25 per foot 3. Controls for each piece of equipment are estimated at $ 600 each 4. Required start-up material is 3,700 pounds at $ 2.70 per pound 5. Company labor for installation requires two maintenance specialists for two days at eight hours per day and $ 35 per hour 6. Contract labor is estimated at a fixed price of $ 7,500 7. Engineering is estimated to be 15% of (equipment / material) cost based on past experience 8. Inspection is estimated to be 3% of (labor) cost based on past experience 9. General and Administrative expenses are estimated to be 5% of the total of (equipment / material) and (labor) based on past experience. Note: For this problem, only items 5 and 6 are considered "labor" for the purpose of calculating items 8 and 9. Check answer: Total project cost = $94,737.60   2-2 Three-point Estimate Problem (a) A project requires the use of structural steel in......

Words: 828 - Pages: 4

Pm592 Week 2

...Budget Report Week 2 Assignment ID Task Name Total Cost 1 Equipment Equipment 1 $15,000 Equipment 2 $35,000 Electrical hook up $10,000 Equipment total cost $60,000 2 Material Start up material $9,990 2 controls for each piece of equipment $1,200 Material total cost $11,190 Equipment and Material Total Cost $71,190 3 Installation Company labor $1,120 Installation total cost $1,120 4 Labor Contract labor $7,500 Labor total cost $7,500 5 Overhead Engineering estimated to be 15% of (equipment /Material) $10,679 Inspection estimated to be 3% of labor cost $259 General and Administrative expenses are estimated to be 5% of the total of equipment/material and labor $3,991 Overhead total cost $14,928 Total project cost $94,738 2.2 Three Point estimate Problem (A) Expected price = (0.24 + (4 x 0.3) + 0.60/6 $0.34 lbs (B) Expected Steel usage = (49tons + (4 x 40tons) + 37tons) / 6 41 Tons 82000.00 lbs ( C) Expected......

Words: 364 - Pages: 2

Pm592 Week 2 Assignment

...2-1 Basic Estimating Problem Equipment/Material $15,000 +$35,000= $ 50,000.00 (400 feet at $25 per foot) 400(25)= 10,000.00 2 pieces of equipment at $600= 1,200.00 (3,700 of equipment at $2.70 per pound) 3,700(2.70) = 9,990.00 Total Equipment/Material $ 71,190.00 Installation/Labor (2 maintenance specialist for 2 days at 8 hours per day at $35 per hour) $35.00(8)= $280.00 per person per day $280.00(2)=$560.00 per person for 2 days $560.00 (2)= $1,120.00 for installation 1,120.00 Fixed Labor = 7,500.00 Installation/Labor $ 8620.00 Overhead Engineering 15% of 71,190 10,678.50 Inspection 3% of $8620 258.60 General and Administrative Expenses 5% of $71,190=$3559.50 + 5% of $8620.00= $431.00 $3559.50 + $431.00 = 3,990.50 Total Overhead $ 14,927.60 Total Project Cost: $71,190.00 + $8620.00 + $14,927.60= $ 94,737.60 2-2 Three-point Estimate Problem A) Price for the material is $0.30/ lb The most optimistic price estimate is $0.24/lb The most pessimistic estimate is $0.62/lb The expected price of the material: Pexp = (Popt + 4 x Pmost + Ppess)/6 Pexp = (0.24 + (4 x 0.30 + 0.62) / 6 Pexp = 0.24 + (1.2 + 0.62) / 6 Pexp = 0.24 + 1.82/ 6 Pexp= 2.06 /6 Pexp = 0.34/ lb B) One Ton = 2,000 lbs Popt = Optimistic Cost = 37 Tons Pmost =......

Words: 484 - Pages: 2

بطاريات | Kaspersky Anti-virus 2017 17 0 0 611 (b) Final + Trial Resetter 1 torrent | Psy-Changeling series